Connectivity and storage functions of channel fens and flat bogs in northern basins
Citations Over TimeTop 12% of 2003 papers
Abstract
Abstract The hydrological response of low relief, wetland‐dominated zones of discontinuous permafrost is poorly understood. This poses a major obstacle to the development of a physically meaningful meso‐scale hydrological model for the Mackenzie basin, one of the world's largest northern basins. The present study examines the runoff response of five representative study basins (Scotty Creek, and the Jean‐Marie, Birch, Blackstone and Martin Rivers) in the lower Liard River valley as a function of their major biophysical characteristics. High‐resolution (4 m × 4 m) IKONOS satellite imagery was used in combination with aerial and ground verification surveys to classify the land cover, and to delineate the wetland area connected to the drainage system. Analysis of the annual hydrographs of each basin for the 4 year period 1997 to 2000, demonstrated that runoff was positively correlated with the drainage density, basin slope, and the percentage of the basin covered by channel fens, and was negatively correlated with the percentage of the basin covered by flat bogs. The detailed analysis of the water‐level response to summer rainstorms at several nodes along the main drainage network in the Scotty Creek basin showed that the storm water was slowly routed through channel fens with an average flood‐wave velocity of 0·23 km h −1 . The flood‐wave velocity appears to be controlled by channel slope and hydraulic roughness in a manner consistent with the Manning formula, suggesting that a roughness‐based routing algorithm might be useful in large‐scale hydrological models. Copyright © 2003 Crown in the right of Canada. Published by John Wiley & Sons, Ltd.
Related Papers
- → The use of a dimensionless unit hydrograph to derive unit hydrographs for some Pacific Northwest basins(1961)19 cited
- → Conversion of Unit Hydrographs by Complementary Hydrograph Method(2002)2 cited
- → Analisis Perbandingan Hidrograf Satuan Sintetik Gama I dan SCS (HEC-HMS) dengan Hidrograf Satuan Terukur di Sungai Way Besai(2019)2 cited
- Analysis of hydrograph timing parameters for selected watersheds(2012)
- 단위유량도합성을 위한 Snyder 계수의 조정(1986)