Physical startup of the RBMK-reactor of the second unit of the V. I. Lenin nuclear power station, Leningrad
Atomic Energy1976Vol. 40(2), pp. 147–153
I. Ya. Emel'yanov, M. B. Egiazarov, V. I. Ryabov, А. Д. Жирнов, V. P. Borshchev, B. A. Vorontsov, Andrey N. Kuzmin, Yu. I. Lavrenov, V. S. Romanenko, Yu. M. Serebrennikov, A. P. Sirotkin
Related Papers
- → Problems in experimental and mathematical investigations of the accidental thermalhydraulic processes in RBMK nuclear reactors(1995)2 cited
- → Evaluation of Heat Removal from RBMK-1500 Core Using Control Rods Cooling Circuit(2008)
- → Development of RBMK in-reactor control(2013)
- → RBMK Safety Analysis in Accidents Initiated by Partial Ruptures of the Circulation Circuit(2002)
- Upgrading of RBMK fuel assembly design and production technology(1996)