Sequencing of parts and robot moves in a robotic cell
International Journal of Flexible Manufacturing Systems1992Vol. 4(3-4), pp. 331–358
Citations Over TimeTop 10% of 1992 papers
Related Papers
- → An efficient heuristic for a two-stage assembly scheduling problem with batch setup times to minimize makespan(2015)58 cited
- → Evaluating the performance for makespan minimisation in no-wait flowshop sequencing(2007)52 cited
- → Two-stage Flowshop Scheduling Problem with Bicriteria(1992)15 cited
- → IMPROVED TIGHTENED MILP FORMULATIONS FOR SINGLE-STAGE BATCH SCHEDULING PROBLEMS(2006)
- → A Two-stage approach for an optimum solution of the car assembly scheduling problem Part 1. Problem statement, solution outline and tutorial example(2015)