A Grid Task Scheduling Algorithm Based on QoS Priority Grouping
2006pp. 58–61
Citations Over TimeTop 11% of 2006 papers
Abstract
As the research of grid goes on, users demand increasingly high quality of task completion and high-quality scientific computing tasks continue to increase. This renders QoS a new problem that is to be considered in the grid scheduling algorithm. In this paper, a grid tasks scheduling strategy based on QoS priority grouping is proposed. In this algorithm, the deadline property of task, acceptation rate of tasks and makespan of systems are comprehensively considered. And QD-Sufferage, a grid task scheduling based on task priority grouping and deadline, is presented subsequently. The experiments show that the algorithm overweighs traditional algorithms a lot in makespan, throughout parameters
Related Papers
- → Dynamic Partitioning Based Scheduling of Real-Time Tasks in Multicore Processors(2015)12 cited
- → The improved EDF scheduling algorithm for embedded real-time system in the uncertain environment(2010)10 cited
- → One-level and two-level scheduling for real-time systems(2013)1 cited
- → Task scheduling in time-triggered real-time systems(2014)