The run IIb trigger upgrade for the DO experiment
IEEE Transactions on Nuclear Science2004Vol. 51(3), pp. 340–344
Citations Over TimeTop 15% of 2004 papers
M. Abolins, J. Bán, J. Bystrický, D. Calvet, D. Chapin, D. Edmunds, H. Evans, L. Han, U. Heintz, M. Hildreth, R. Hirosky, K. A. Johns, M. Johnson, P. Laurens, P. Le Du, J. Mitrevski, M. Narain, J. Olsen, P. Padley, J. A. Parsons, R. Partridge, E. Pérez, W. Sippach, Jeffrey Steinberg, G. Tarte, G. Wilson, D. Wood, S. Wu
Abstract
The increase in instantaneous luminosity anticipated in Run IIb of the Tevatron collider at Fermilab requires increased background rejection capabilities from the trigger system of the DO detector. A set of upgrades is under way to improve triggering at level 1 in the calorimeter and tracker, and at level 2 in the silicon track trigger and software triggers. Reductions of up to a factor of ten on the rates of high transverse momentum triggers are anticipated with the upgrades described.
Related Papers
- → B physics at the Fermilab Tevatron after the year 2000(1995)7 cited
- → Performance of a beam monitor in the fermilab tevatron using synchrotron light(2004)7 cited
- → Status of the Tevatron collider: Performance and upgrades(1992)
- → PHYSICS AT FERMILAB TEVATRON(2001)
- → Fermilab's superconducting synchrotron strives for 1 TeV(1984)