0 citations
Comparative Study of Prestressed Concrete Beams, With and Without Bond
ACI Journal Proceedings1971Vol. 68(2)
Citations Over TimeTop 14% of 1971 papers
Abstract
First Name is required invalid characters Last Name is required invalid characters Email Address is required Invalid Email Address Invalid Email Address
Related Papers
- A simplified method to develop LRFD preliminary design charts for prestressed concrete bridges(2015)
- Design Method for Concrete Continuous Girder Bridge to be Constructed by Precast Segmental Cantilever Erection(2006)
- Design of Main Bridge of Yunshi Hanjiang River Bridge(2013)
- Research and Design of TP75 Overhead Launching Gantry for Segmental Assembling of Sutong Bridge(2007)
- Construction Technique for Stiffening Diagonal Struts of Prestressed Concrete Box Girder with Broad Width and Thin Walls(2013)