PHENIX Fast TOF
2014
Aria Soha, Mickey Chiu, E. J. Mannel, Sean Stoll, Don Lynch, S. Boose, Dave Northacker, M. Alfred, James Lindesay, T. Chujo, M. Inaba, Toshihiro Nonaka, Wataru Sato, Ikumi Sakatani, Masahiro Hirano, I. J. Choi
Abstract
This is a technical scope of work (TSW) between the Fermi National Accelerator Laboratory (Fermilab) and the experimenters of PHENIX Fast TOF group who have committed to participate in beam tests to be carried out during the FY2014 Fermilab Test Beam Facility program. The goals for this test beam experiment are to verify the timing performance of the two types of time-of-flight detector prototypes.