Conceptual Design Report: Fermilab Upgrade: Main Injector - Technical Components and Civil Construction, January, 1989
1989
Abstract
This report contains a description of the design and cost estimate of a new 150 GeV accelerator, designated the Main Injector, which will be required to support the upgrade of the Fermilab Collider. The construction of this accelerator will simultaneously result in significant enhancements to the Fermilab fixed target program.
Related Papers
- → Emittances through the fermilab accelerator chain(1989)2 cited
- → Accelerator R&D at Fermilab’s FAST/IOTA for Future High Intensity Proton Accelerators(2018)
- Recent Operational Experience with the Fermilab Tevatron(1989)
- → Fermilab accelerator reaches 500 GeV…(1976)
- → Controls at the Fermilab PIP-II Superconducting Linac(2023)