0 citations
Design Challenges in High-Current Pulsed Striplines [Poster]
2022
Citations Over Time
Abstract
The Long Baseline Neutrino Facility (LBNF) will produce world's most intense neutrino beam.Three series connected magnetic horns will require 5 kV, 300 kA, 800 s pulses at a rate of 1.4 Hz to focus the beam.Connecting a single power supply to these focusing horns will require a low impedance connection measuring over 60 m in length.To meet the challenging requirements of connecting the horns to the power supply, this connection is engineered as a nine-conductor, high-current pulsed stripline.It must pass through a harsh radiation environment, be passively cooled, and have an operational lifetime of at least 30 years.
Related Papers
- → An Investigation of Magnetic-Field-Assisted Material Removal in Micro-EDM for Nonmagnetic Materials(2011)83 cited
- → Theoretical Investigation of the Inclined Sidewall Design on Magnetohydrodynamic (MHD) Forces in an Aluminum Electrolytic Cell(2010)30 cited
- → On the inclusion of Lorentz force effects in TCAD simulations(2011)2 cited
- → On the Relations between Ampere Force and Lorentz Force(2011)1 cited
- → Magnetohydrodynamics from a blacksmith's perspective(1990)