PIP-II High Beta 650 Prototype Cryomodule Assembly Experience and Related Design Optimization
2024
J. Ozelis, Maria Barba, J. Bernardini, Crispin Contreras-Martinez, Dana C. Crawford, Jiankai Dong, V. Grzelak, P. Hanlet, Jeremiah Holzbauer, Yi Jia, S. Kazakov, T. Khabiboulline, J. Makara, N. Patel, Vishal M. Patel, L. Pei, D. Peterson, Yuriy Pischalnikov, D. Porwisiak, S. Ranpariya, J. Steimel, N. Solyak, J. Subedi, A.I. Sukhanov, P. Varghese, T. Wallace, Mike White, Sajini Wijethunga, Y. G. Xie, Sang Won Yoon
Abstract
After shipment to the Daresbury Lab and return to Fermilab, the prototype HB650 cryomodule underwent another phase of 2K RF testing to ascertain any performance issues that may have arisen from the transport of the cryomodule. While measurements taken at room temperature after the conclusion of shipment indicated that there were no negative impacts on cavity alignment, beamline vacuum, or cavity frequency, testing at 2K was required to validate other aspects such as tuner operation, cavity coupling, cryogenic system integrity, and cavity performance. Results of this latest round of limited 2K testing will be presented.
Related Papers
- → STKVS: secure technique for keyframes-based video summarization model(2024)7 cited
- Study and Two Types of Typical Usage of DataGrid Web Server Control(2005)
- Using DataGrid Control to Realize DataBase of Querying in VB6.0(2000)
- Susquehanna Chorale Spring Concert "Roots and Wings"(2017)
- → ИСПОЛЬЗОВAНИЕ ПОТЕНЦИAЛA СОЦИAЛЬНЫХ ПAРТНЕРОВ В ПОДГОТОВКЕ БУДУЩИХ ПЕДAГОГОВ(2024)