Estimating electricity storage power rating and discharge duration for utility transmission and distribution deferral :a study for the DOE energy storage program.
2005
Citations Over Time
Abstract
This report describes a methodology for estimating the power and energy capacities for electricity energy storage systems that can be used to defer costly upgrades to fully overloaded, or nearly overloaded, transmission and distribution (T&D) nodes. This ''sizing'' methodology may be used to estimate the amount of storage needed so that T&D upgrades may be deferred for one year. The same methodology can also be used to estimate the characteristics of storage needed for subsequent years of deferral.
Related Papers
- → Donors' perspectives on self‐deferral of men having sex with men from blood donation(2013)14 cited
- → Travel behavior and deferral ofDutch blood donors: consequences for donor availability(2014)9 cited
- Pre-donation Deferral of Blood Donors in Tertiary Care Hospital Attached to Medical College in Southern Rajasthan(2016)
- → Science in action? A critical view of UK blood donation deferral policy and men who have sex with men(2021)2 cited