Causation Identification and Control Measures of Deformation by Integrated Dewatering-Excavation Process Simulation of a T-Shaped Deep Foundation Pit
Citations Over Time
Abstract
Construction of subway line intersection stations will become more and more popular in the future. Research on the deformation characteristics in the construction process is the best way to ensure the safety of the foundation pit itself, the surrounding buildings, and adjacent subway stations. In this paper, the deformation characteristics of a T-shaped subway foundation pit during construction are studied by an integrated dewatering-excavation three-dimensional numerical simulation method. The results show that the main causation of the surface settlement around the foundation pit is the stratum compression caused by dewatering, and the main causation of the deformation of the diaphragm wall and the existing subway station is the soil deformation caused by excavation unloading. It is suggested that constructing a high-quality diaphragm wall, controlling the water level within the excavation foundation pit, strengthening the monitoring, and timely cement pouring of the bottom plate are key countermeasures to reduce the deformation. The research results of this paper have reference significance for similar projects.
Related Papers
- Analysis and repair measures for influence of dewatering of deep foundation pits on surrounding environment(2008)
- → Study on the Stratum Deformation Caused by Tunnel Excavation with Different Division of Cross-Section(2009)2 cited
- → Dewatering Design and Discuss of Foundation Pit Excavation in Disposal Site with Contaminated Soil(2013)
- The application of dewatering in deep foundation pit(2002)
- The application of tube well dewatering in treatment of weak permeable stratum in deep excavation work(2007)