0 citations
A new scheduling algorithm for the LHCb upgrade trigger application
Journal of Physics Conference Series2020Vol. 1525(1), pp. 012052–012052
Citations Over Time
Abstract
Abstract During Run3 of the LHC the LHCb detector will process a 30 MHz event rate with a full detector readout followed by a software trigger. To deal with the increased computational requirements, the software framework is reviewed and optimized on a large scale. One challenge is the efficient scheduling of O (10 3 )- O (10 4 ) algorithms in the High Level Trigger (HLT) application. This document describes the design of a new algorithm scheduler which allows for static-order intra-event scheduling with minimum complexity while still providing the required flexibility.
Related Papers
- AN UPGRADE PRACTICE OF A DOUBLE-RACK SOURCE ~(60)Co SOURCE IRRADIATOR(2009)
- Research and Implementation for Database Upgrade of Information System(2012)
- Research on Software Upgrade of Surface Meteorological Observation Operational System(2012)
- Upgrade of Monitoring System for 500 kV Shuanglong Substation(2012)
- → LHCb Run 2 trigger and upgrade reconstruction(2019)