0 references
LHCb Run 2 trigger and upgrade reconstruction
Proceedings of The 39th International Conference on High Energy Physics — PoS(ICHEP2018)2019pp. 225–225
Abstract
The LHCb trigger strategy for Run II (2015--2018) and the upgrade era from Run III (2021) onwards are discussed. A crucial aspect of the LHCb upgrade is the removal of the hardware trigger, so LHCb will move to a fully software based trigger. The latest studies and progress from the upgrade tracking and reconstruction sequence, that will form the basis of the upgrade trigger, are presented.
Related Papers
- AN UPGRADE PRACTICE OF A DOUBLE-RACK SOURCE ~(60)Co SOURCE IRRADIATOR(2009)
- Research and Implementation for Database Upgrade of Information System(2012)
- Research on Software Upgrade of Surface Meteorological Observation Operational System(2012)
- Upgrade of Monitoring System for 500 kV Shuanglong Substation(2012)
- → LHCb Run 2 trigger and upgrade reconstruction(2019)